-
Case Studies 12/23/2020
BASEMENT CONVERSION TO GRANNY FLAT ( Sanicubic2 Pro)
OBJECTIVE: Create a private retreat/multipurpose space. CHALLENGE: Plumbing needed under the sewerage and stormwater mains. SOLUTION: Sanicubic 2 Pro WP.
Read more -
Case Studies 12/17/2020
LUXURY CABIN ( Sanicubic1)
OBJECTIVE: To renovate the heritage cabins and create an inclusive luxurious experience CHALLENGE: Plumbing solution required for the elevated bathroom drainage
Read more -
Case Studies 12/16/2020
MEDISTAY HOSPITAL ACCOMODATION ( Sanipack)
OBJECTIVE: Create all-inclusive accommodation for families visiting hospital patients. CHALLENGE: Plumbing needed in a multistorey office building SOLUTION: Sanipack
Read more -
Case Studies 12/15/2020
END OF TRIP FACILITY ( Sanishower)
OBJECTIVE: Create an end of trip facility complete with showers. CHALLENGE: Plumbing needed in the basement of a multistorey office building. SOLUTION: Sanifloor
Read more -
Case Studies 11/27/2020
EARLY LEARNING CENTRE ( Sanispeed, Sanaccess2 and Sanicom1)
OBJECTIVE: To create a space with all essential amenities CHALLENGE: Plumbing needed in a multistorey building on a concrete slab SOLUTION Saniseed, Saniaccess 2 and Sanicom 1
Read more