-
Case Studies 06/14/2022
Sanispeed + commercial grey water pump & 7-eleven national smoothie machine roll out
OBJECTIVE:To offer ease of installation of smoothie machines in store nationally. CHALLENGE: Lack of traditional gravity drainage connections where required. SOLUTION: Sanispeed+
Read more -
Case Studies 06/14/2022
Sanicubic 1GR helps homeowners turn a boatshed into guest accomodation
Objective: To convert an existing boatshed into guest accommodation Challenge: Installation of a bathroom and kitchen without access to traditional plumbing Solution: Sanicubic 1GR
Read more -
Case Studies 08/23/2021
Office Space Transformed into Fully Equipped Doctor’s Clinic (Sanifast)
Office Space Transformed into Fully Equipped Doctor’s Clinic without adequate traditional plumbing
Read more -
Case Studies 02/13/2021
GYNAECOLOGY CLINIC ( Sanicom1, Saniaccess2 and Sanispeed)
The Anglesea Gynaecology Clinic is a premium centre considered one of the best in New Zealand. The facility where the clinic was located had become too small for their demand, so the clinic needed to relocate and custom design the new space to meet their needs.
Read more -
Case Studies 01/14/2021
WATERFRONT PROPERTY ( Sanispeed and Sanicubic1)
OBJECTIVE: Create a home gym and steam room with Harbour views. CHALLENGE: Plumbing needed to push waste back uphill to the sewerage mains. SOLUTION Sanispeed and Sanicubic 1 WP
Read more